[masterslider id=”35″]
Overview
The Pine Point Lead-Zinc project covers more than 23,000 hectares near the town of Hay River, Northwest Territories. The Project had past production of 64 million tonnes grading 7.0% zinc and 3.1% lead from 52 deposits, and hosts an additional 46 known deposits. Pine Point has completed a Preliminary Economic Assessment on the project as a first step towards bringing it back into production, and is in the planning stages of a Feasibility Study.
Visit pinepointmining.com
Presentation
Corporate presentationLatest Articles
- Osisko Metals acquires Pine Point Mining: a good long-term solution
- Pine Point receives positive L36 recovery results
- Darnley Bay’s ongoing infill drill program confirms mineralization
- Report: Darnley Bay Resources – The PEA is a first step to restart zinc production at Pine Point
- Report: Darnley Bay Resources – Bringing an old zinc district back to life
Press Releases
Error: Feed has an error or is not valid.
Contact
365 Bay Street, Suite 400
Toronto, Ontario
Canada M5H 2V1
Tel. 416-862-7885
Fax. 416-361-2519
Investor Relations
Jamie Levy
President & CEO
jlevy@darnleybay.com
416-567-2440