Aston Bay Holdings (BAY.V) has released the outcome of a pre-feasibility study on its flagship Storm Copper project in Canada’s Nunavut territory. Aston Bay maintains a 20% free carried interest until a decision to mine is made, where after it will have to contribute to the expenditures on a pro rata basis.
The pre-feasibility study is based on the 12.6 million tonne probable reserve estimate which has an average grade of 1.20% copper and 3.7 g/t silver.
The after-tax NPV7% comes in at C$165M (which means Aston Bay’s stake is valued at C$33M on an NPV basis) using US$5.30 copper and US$50 silver, while the internal rate of return comes in at 32.8% thanks the the low up-front capital expenditures. The pre-development capital requirements are estimated at almost C$38M while the initial capex comes in at just under C$113M. Under the current mine plan, a total of 208 million payable pounds of copper and 351,000 ounces of silver will be recovered. The AISC of the copper production is estimated at US$3.45 per pound, after taking the revenue from the silver into consideration as a by-product credit, using $50 silver.
Applying $6.53 copper and $49.98 silver, the after-tax NPV7% almost doubles to C$324M, of which just under C$65M would be attributable to Aston Bay.
Disclosure: The author has no position in Aston Bay Holdings. This post is for educational purposes only; be mindful investing in junior mining stocks is risky and you may lose your entire investment if things go wrong. Please read the disclaimer.