Tag: Bachelor Lake mine

BonTerra Resources now has five rigs on site

BonTerra Resources now has five rigs on site

BonTerra Resources (BTR.V) is in the middle of its 70,000 meter drill program at the Gladiator deposit and five drill rigs are currently active on the project site. These five rigs will be focusing on drilling the Gladiator deposit out with a 50 meter hole spacing for a total program […]