Tag: #FeasibilityStudy

Avnel Gold becomes increasingly interesting

Avnel Gold becomes increasingly interesting

In another exploration update, Avnel Gold (AVK.TO) has announced it discovered more shallow and high-grade mineralized zones towards the west of the currently known resources at its Kalana project. With intercepts of 3 meters at 1.3 ounces of gold per tonne of rock as well as 4 meters of 22.5 […]

NioCorp’s PEA is underwhelming

NioCorp’s PEA is underwhelming

NioCorp Developments (NB.TO) has announced the results of the Preliminary Economic Assessment it conducted on its Elk Creek Niobium project in the USA. The after-tax NPV6-9% is okay-ish at $420M-960M but there are some other developments we are rather unhappy about. The total capital expenditure is approximately $919M which is […]

Sirius Resources’ Nova feasibility study exceeds our expectations

Sirius Resources’ Nova feasibility study exceeds our expectations

Sirius Resources (ASX:SIR) has released the results of the long awaited feasibility study on its Nova nickel project, located approximately 700 km east of Perth in Western Australia. This is a remarkable event, as this is probably the first time a company is able to show a definitive feasibility study […]

Nevada Copper - Exposure to copper, gold and silver in a safe region

Report: Nevada Copper – Exposure to copper, gold & silver in a safe region

Nevada Copper (NCU.TO) is an extremely enticing story, as not only has the company received all permits to start production at the underground phase of the Pumpkin Hollow project but has already started constructing a shaft for the underground development phase. [download_link link=”http://www.caesarsreport.com/freereports/CaesarsReport_2014-03-06.pdf” variation=”blue”] DOWNLOAD REPORT [1.7MB][/download_link]

Sunridge Gold corrects the results of the Asmara Feasibility Study

Sunridge Gold corrects the results of the Asmara Feasibility Study

Sunridge Gold (SGC.V) announced today they released the wrong numbers in their press release on the outcome of the feasibility study of the Asmara Project in Eritrea. The NPV10% in the low case scenario drops to $69M from $131M (-47%), and the low copper price scenario now comes in at […]