Tag: #SSRMining

Abraplata: a call option on the silver price?

Abraplata: a call option on the silver price?

Abraplata (ABRA.V) has released the final results of its Preliminary Economic Assessment on the 100% owned Diablillos silver-gold project in Argentina’s Salta province. The company anticipates a production scenario of 9.8 million silver-equivalent ounces (or 136,000 gold-equivalent ounces) which would be produced at an all-in cost of $7.52 per silver-equivalent […]

Riverside’s President and CEO, John-Mark Staude, visits Cecilia

Report: Riverside Resources Site Visit

View site visit photo gallery → In February, we flew to Mexico to kick the proverbial tires of Riverside Resources (RRI.V), a prospect generator with a very specific focus on Mexican projects. Although Riverside owns 9 projects, we were only able to visit two of them during our stay in Mexico’s […]

Valor Resources’ Berenguela project now contains 46 million tonnes of ore

Valor Resources’ Berenguela project now contains 46 million tonnes of ore

Valor Resources (ASX:VAL), which purchased the Peruvian Berenguela project from SSR Mining (SSRM, SSRM.TO), has now released a JORC-compliant resource estimate (keep in mind the project was subject to the NI43-rules when SSR Mining owned it). This updated resource estimate shows an 80% increase in the total resources whilst the […]

Valor drills high-grade silver-copper intercepts

Valor drills high-grade silver-copper intercepts

Valor Resources (ASX:VAL) has started to drill the Berenguela copper-silver project in Peru, which it acquired from SSR Mining (SSRM, SSRM.TO). The company has been drilling within the inferred resource shell (to upgrade the inferred resources to a higher category) as well as in the known extensions to this inferred […]

Abraplata’s strategy is already paying off

Abraplata’s strategy is already paying off

In a previous update on AbraPlata Resource Corp. (ABRA.V), we explained how the Fantasma zone could boost the potential economics of the Diablillos silver-gold property. As the strip ratio of the main zone would require substantial pre-stripping capex, the company wanted to investigate the possibility to define a resource at […]